免费a级毛片18禁

    <code id="wkag4"></code>

    <code id="wkag4"><menu id="wkag4"></menu></code>
    <tr id="wkag4"></tr>
    <tr id="wkag4"></tr>
  1. <object id="wkag4"><option id="wkag4"></option></object>

    <pre id="wkag4"><small id="wkag4"></small></pre>
    <center id="wkag4"></center>
    <th id="wkag4"></th>

    Your present location:Home >> The engineering case >> NPK case show >> npk fertilizer plant with equipments and machines

    Case presentation
    Company Profile
    Product Description

    KTT could provide the whole set of NPK engineering services covers every stage.

    Technical advantage

    KTT makes high concentration NPK fertilizer by the rotation and granulation method of melting tower.

    Comparing with the general production technique of making NPK fertilizer,the melting gradulation method has advantages as followings:

    1.Using the urea melt,cancles the procedures of spraying granulation for melting urea,and packing,transport and smashing for solid urea,simplfied the procedures of production.
    2.The melting granulation method makes effective use of the energy of melting urea.This method does not need low moisure contained,not need drying process and save plenty of energy consumption.
    3.The granulation yield is high and almost no recycles.
    4.The surface of granuals is smooth,round and low moisture contained (less than 1%).It is also anticaking and resisting pressure (greater than 30N).The product is in high competitiveness.
    5.it is clean production technique due to the good operation environment and no waste emission.
    6.It can produce high nitrogen urea-based compound fertilizer.

    Overall operation advantages

    Professional logistic team, rich experience on container transportation and bulk transport.
    Powerful customs clearance ability. Our forwarders have good relationship with Inspection Bureau and customs.
    Complete database of cargoes, especially detailed information for set of NPK .etc equipment suppliers and shipping.
    Strong ability to integrate the export and import documents. Such as customs clearance documents, C/O, and embassy certification documents .etc.

    Case List
    No.
    Case
    Date
    1
    SOGP plant in Philippines for 10,000MTPA
    In 2016 Year
    2
    EPC projects of SOP in Egypt for 60,000MTPA&100,000MTPA
    In 2015 Year
    3
    Overhaul the furnace in Indonesia
    In 2011 Year
    4
    The project of SOP for 40,000MTPA
    In 2010 Year
    5
    Main equipment suppiler of SOP in India for 20,000MTPA
    In 2008 Year
    6
    Overhaul the furnace in Indonesia
    In 2007 Year
    7
    The contractor of SOP in Phlilippines for 10,000MTPA
    In 2006 Year
    8
    The EPC project of SOP in Indonesia for 10,000MTPA
    In 2004 Year
    9
    The equipment suppiler of FRP tank in Phlilippines 
    In 2004 Year
    10
    The contractor of SOP in Phlilippines for 10,000MTPA
    In 2004 Year
    免费a级毛片18禁
      <code id="wkag4"></code>

      <code id="wkag4"><menu id="wkag4"></menu></code>
      <tr id="wkag4"></tr>
      <tr id="wkag4"></tr>
    1. <object id="wkag4"><option id="wkag4"></option></object>

      <pre id="wkag4"><small id="wkag4"></small></pre>
      <center id="wkag4"></center>
      <th id="wkag4"></th>