免费a级毛片18禁

    <code id="wkag4"></code>

    <code id="wkag4"><menu id="wkag4"></menu></code>
    <tr id="wkag4"></tr>
    <tr id="wkag4"></tr>
  1. <object id="wkag4"><option id="wkag4"></option></object>

    <pre id="wkag4"><small id="wkag4"></small></pre>
    <center id="wkag4"></center>
    <th id="wkag4"></th>

    Your present location:Home >> The engineering case >> Chemical equipment >> Graphite thin-film absorber equipment

    Case presentation
    Company Profile

    Kindly (Beijing) Tech Trading Co., Ltd. (KTT) is an international chemical engineering company, who is pioneering in chemical engineering technologies, and playing a leading role in new technology development, with capability of project consulting, management and project delivery on EPC. 

    On the other hand, we involve in the business of trading of bulk fertilizers, chemicals and machinery. 

    KTT has been dedicated to the technical development of fertilizer production process, such as optimization, technical innovation, and new process research. In last 12 years, we have been researching production of sulfuric acid (H2SO4), potassium sulfate (K2SO4), ammonia phosphate, NPK, etc. Our company has energized the technical improvement of the industry, and completed more than 100 consulting, design, construction and general contracting projects locally and internationally; the projects spread in 20 provinces in China, Southeast Asia and the Middle East.

    Product Description

    TGX series of falling film absorber is mainly used for hydrogen chloride gas absorption into hydrochloric acid, with the highest working temperature up to130 ℃. The outer shell is made of FRP. It has a long service life, high reliability, easy maintenance, etc.

    Technical Data

     
    Tube side (hot fluid)
    Shell side(cold fluid)
    Max. operation pressure
    0.1MPA
    0.1MPA
    Design pressure
    0.1MPA
    0.1MPA
    Max. operation temp.
    70℃
    50℃
    Design temp.
    70℃
    50℃
    Case List
    No.
    Case
    Date
    1
    SOGP plant in Philippines for 10,000MTPA
    In 2016 Year
    2
    EPC projects of SOP in Egypt for 60,000MTPA&100,000MTPA
    In 2015 Year
    3
    Overhaul the furnace in Indonesia
    In 2011 Year
    4
    The project of SOP for 40,000MTPA
    In 2010 Year
    5
    Main equipment suppiler of SOP in India for 20,000MTPA
    In 2008 Year
    6
    Overhaul the furnace in Indonesia
    In 2007 Year
    7
    The contractor of SOP in Phlilippines for 10,000MTPA
    In 2006 Year
    8
    The EPC project of SOP in Indonesia for 10,000MTPA
    In 2004 Year
    9
    The equipment suppiler of FRP tank in Phlilippines 
    In 2004 Year
    10
    The contractor of SOP in Phlilippines for 10,000MTPA
    In 2004 Year
    Detailed Images
    Certifications
    免费a级毛片18禁
      <code id="wkag4"></code>

      <code id="wkag4"><menu id="wkag4"></menu></code>
      <tr id="wkag4"></tr>
      <tr id="wkag4"></tr>
    1. <object id="wkag4"><option id="wkag4"></option></object>

      <pre id="wkag4"><small id="wkag4"></small></pre>
      <center id="wkag4"></center>
      <th id="wkag4"></th>